SS BuildersGroup07792 281 879

Layered, dimmable, and planned before plaster · All 32 London boroughs

Lighting in London

Spotlight installation, feature and outdoor lighting, smart controls and circuit design.

Open-plan refurbishment

What we do

Lighting is decided before the plaster goes on or it costs three times as much afterwards. We plan circuits, switching and dimming at first fix so the room can be lit for cooking, for eating and for sitting in — not just switched on.

Included as standard

  • Recessed spotlights and fire-rated downlights
  • Feature, pendant and under-cabinet lighting
  • Dimming circuits and multi-way switching
  • Smart lighting and app control
  • Outdoor, garden and security lighting
  • Bathroom lighting to correct IP rating
Typical timescale
2–5 days
Coverage
32 boroughs
Payment
In arrears
Trading since
2008

Circuits, fire ratings and IP zones

Lighting is electrical work, so it falls under Part P and is certificated with the rest of the installation. Circuits, switching and dimming are designed at first fix, before any plasterboard goes up.

Recessed downlights cut holes in a ceiling that may form part of a fire-resisting construction — between floors, or between a garage and the dwelling. Fire-rated downlights restore that resistance, and in a loft-converted house they are not optional.

In bathrooms, fittings must carry an IP rating appropriate to their zone. The zones around a bath or shower dictate what may be installed where, and getting it wrong is both a safety problem and a certification problem.

Good lighting design is layered: ambient light for the room, task light where work happens, and accent light for the things worth looking at, each on its own circuit so the room can be lit differently at different times.

The limits above are the national permitted-development rules for England. Your borough may restrict them further through a conservation area or an Article 4 direction — we confirm the position for your address in writing before quoting.

Our work

Lighting we have completed

Open-plan interior with recessed spotlighting after refurbishment
Open-plan refurbishment
Brick rear extension with French doors opening onto a landscaped garden
Brick extension and garden
Rear loft conversion with new windows and Juliet balcony on a brick terrace
Loft conversion, rear elevation
Rendered multi-storey rear elevation of a new build under construction
New build, rear elevation

Answers

Lighting — common questions

Do I need planning permission for lighting in London?

It depends on the property type and what is proposed. Many single-storey rear extensions and loft conversions fall under permitted development, but those rights do not apply to flats and are restricted in conservation areas or where an Article 4 direction applies. We check the planning position for your specific address before quoting, and tell you in writing which route applies.

How do you price the work?

From a site survey, written up as a fixed and itemised scope before any deposit is discussed. If something genuinely unforeseen appears once work is opened up, it is priced and agreed in writing before we continue — never added to the final invoice after the fact.

When do I pay?

In arrears of work completed. You pay for work that has been done and inspected, not for work that has been promised. This has been how the company operates since 2008.

Do you handle Party Wall notices?

Yes, where the work requires them. Under the Party Wall etc. Act 1996, notifiable work on a shared wall needs 2 months written notice to the adjoining owner, while excavation near a neighbouring structure and building at the line of junction need 1 month. We serve the notices and manage the award process as part of the job.

Will I get certificates at the end?

Yes. Electrical work is tested and certificated under Part P, and building control issues a completion certificate where an application was required. You receive the handover pack — it is what a buyer's solicitor will ask for when you eventually sell.

How long will it take?

It depends entirely on scope, and we give a programme with the written quote rather than a guess on the phone. What we will not do is start a job we cannot resource, which is the usual reason a build stalls halfway through.

By area

Lighting across London

Also from us

Related trades

Looking for something else? See all 19 services or browse by borough.

Skip the forms

Get a price for your lighting

A picture and a postcode tells us more than any enquiry form. You will get a straight answer about cost and whether it needs planning permission.

CallWhatsAppQuote
WhatsApp us