
First fix, second fix, signed off · All 32 London boroughs
Plumbing in London
Full plumbing installation, bathrooms, kitchens, heating systems and drainage.
Bathroom, fitted
Fitted bathroom with basin unit, chrome towel radiator and full-height tilingWhat we do
We handle plumbing as part of the build rather than as a separate visit — first fix goes in before plaster, second fix after decoration, and the programme is sequenced so no trade waits on another.
Included as standard
- First and second fix plumbing
- Bathroom and en-suite installation
- Kitchen plumbing and appliance connection
- Central heating, radiators and boiler relocation
- Soil pipes, waste and above-ground drainage
- Water main and stopcock upgrades
- Typical timescale
- Priced per job
- Coverage
- 32 boroughs
- Payment
- In arrears
- Trading since
- 2008
Regulations that apply
Above-ground drainage and waste is covered by Part H of the Building Regulations, and any new or relocated soil stack, waste run or gully is inspected. Falls, pipe sizes and rodding access all matter, and getting them wrong shows up as a smell or a blockage months later.
Water supply work is subject to the Water Supply (Water Fittings) Regulations, which govern backflow prevention and which fittings may be installed. Gas work is a separate regime entirely: it must be carried out by a Gas Safe registered engineer, and we use registered engineers for it.
In a refurbishment the sequencing matters as much as the pipework. First fix goes in before plaster, second fix after decoration, and a job that gets that order wrong ends up chasing finished walls.
The limits above are the national permitted-development rules for England. Your borough may restrict them further through a conservation area or an Article 4 direction — we confirm the position for your address in writing before quoting.
Our work
Plumbing we have completed




Answers
Plumbing — common questions
Do I need planning permission for plumbing in London?
It depends on the property type and what is proposed. Many single-storey rear extensions and loft conversions fall under permitted development, but those rights do not apply to flats and are restricted in conservation areas or where an Article 4 direction applies. We check the planning position for your specific address before quoting, and tell you in writing which route applies.
How do you price the work?
From a site survey, written up as a fixed and itemised scope before any deposit is discussed. If something genuinely unforeseen appears once work is opened up, it is priced and agreed in writing before we continue — never added to the final invoice after the fact.
When do I pay?
In arrears of work completed. You pay for work that has been done and inspected, not for work that has been promised. This has been how the company operates since 2008.
Do you handle Party Wall notices?
Yes, where the work requires them. Under the Party Wall etc. Act 1996, notifiable work on a shared wall needs 2 months written notice to the adjoining owner, while excavation near a neighbouring structure and building at the line of junction need 1 month. We serve the notices and manage the award process as part of the job.
Will I get certificates at the end?
Yes. Electrical work is tested and certificated under Part P, and building control issues a completion certificate where an application was required. You receive the handover pack — it is what a buyer's solicitor will ask for when you eventually sell.
How long will it take?
It depends entirely on scope, and we give a programme with the written quote rather than a guess on the phone. What we will not do is start a job we cannot resource, which is the usual reason a build stalls halfway through.
By area
Plumbing across London
Also from us
Related trades
Looking for something else? See all 19 services or browse by borough.
Skip the forms
Get a price for your plumbing
A picture and a postcode tells us more than any enquiry form. You will get a straight answer about cost and whether it needs planning permission.