
Watertight, and it stays that way · All 32 London boroughs
Roof Tiling in London
New roofs, re-roofing, tile and slate repair, flat roofing, leadwork and guttering.
Loft conversion, rear elevation
Rear loft conversion with new windows and Juliet balcony on a brick terraceWhat we do
Most London roof work is re-roofing rather than new — stripping back to rafters, upgrading the felt and battens, and relaying with matched or reclaimed tiles. We do the leadwork ourselves, which is where most roof leaks actually begin.
Included as standard
- Full re-roofing and new roof construction
- Clay, concrete tile and natural slate
- Flat roofing: GRP, EPDM and felt systems
- Leadwork, flashings, valleys and chimney trays
- Fascias, soffits, guttering and downpipes
- Roof insulation and ventilation upgrades
- Typical timescale
- 1–3 weeks
- Coverage
- 32 boroughs
- Payment
- In arrears
- Trading since
- 2008
Weathering details and ventilation
Most roof failures are not tile failures. They begin at the junctions — flashings, valleys, chimney trays and abutments — all of which are leadwork. Lead has to be the correct code for its exposure and fixed in lengths that allow for thermal movement, or it splits.
Modern re-roofing also has to deal with ventilation. A well-sealed, well-insulated roof without adequate ventilation moves the condensation risk into the structure itself, so ventilation at eaves and ridge is designed alongside the insulation rather than added as an afterthought.
Re-roofing more than a quarter of a roof's area is notifiable under the Building Regulations and brings a requirement to improve the thermal performance of the roof where it is reasonably practicable to do so.
The limits above are the national permitted-development rules for England. Your borough may restrict them further through a conservation area or an Article 4 direction — we confirm the position for your address in writing before quoting.
Our work
Roof Tiling we have completed




Answers
Roof Tiling — common questions
Do I need planning permission for roof tiling in London?
It depends on the property type and what is proposed. Many single-storey rear extensions and loft conversions fall under permitted development, but those rights do not apply to flats and are restricted in conservation areas or where an Article 4 direction applies. We check the planning position for your specific address before quoting, and tell you in writing which route applies.
How do you price the work?
From a site survey, written up as a fixed and itemised scope before any deposit is discussed. If something genuinely unforeseen appears once work is opened up, it is priced and agreed in writing before we continue — never added to the final invoice after the fact.
When do I pay?
In arrears of work completed. You pay for work that has been done and inspected, not for work that has been promised. This has been how the company operates since 2008.
Do you handle Party Wall notices?
Yes, where the work requires them. Under the Party Wall etc. Act 1996, notifiable work on a shared wall needs 2 months written notice to the adjoining owner, while excavation near a neighbouring structure and building at the line of junction need 1 month. We serve the notices and manage the award process as part of the job.
Will I get certificates at the end?
Yes. Electrical work is tested and certificated under Part P, and building control issues a completion certificate where an application was required. You receive the handover pack — it is what a buyer's solicitor will ask for when you eventually sell.
How long will it take?
It depends entirely on scope, and we give a programme with the written quote rather than a guess on the phone. What we will not do is start a job we cannot resource, which is the usual reason a build stalls halfway through.
By area
Roof Tiling across London
Also from us
Related trades
Looking for something else? See all 19 services or browse by borough.
Skip the forms
Get a price for your roof tiling
A picture and a postcode tells us more than any enquiry form. You will get a straight answer about cost and whether it needs planning permission.