SS BuildersGroup07792 281 879

East London · RM1 · RM2 · RM3 · RM4

Tiling in Havering

Set out from the eye line, not the corner. Family-run since 2008, working across Havering and all 32 London boroughs.

Extension + loft, North Finchley

Tiling for Havering homes

Good tiling is set out before the first tile goes down — from the eye line and the focal wall, so cuts land where nobody looks. We tank wet areas properly, because a wet room that leaks takes the ceiling below with it.

Predominantly 1930s suburban semis and detached houses in Hornchurch and Upminster, post-war stock around Harold Wood and Rainham, and Victorian terraces in central Romford. Generous plot depths make rear extensions straightforward here more often than elsewhere in London.

That housing mix matters more than it sounds. It determines whether your tiling is a straightforward job or a structural one — how the loads transfer, whether a Party Wall Award is likely, and what the council will accept on the elevation. We survey before we price, so the number you get reflects your actual house rather than an average one.

Included as standard

  • Wall and floor tiling in ceramic and porcelain
  • Large-format and natural stone
  • Wet room tanking and waterproofing
  • Underfloor heating over-tiling
  • Levelling, screeding and substrate preparation
  • Grouting, sealing and silicone finishing
Timescale
2–6 days per room
Planning authority
London Borough of Havering
Postcodes
RM1, RM2, RM3, RM4
Housing stock
Suburban, inter-war

Substrates, tanking and movement

Tiling is only ever as good as what it is stuck to. Substrates must be flat, rigid and dry, and floors need enough stiffness that deflection does not crack the grout lines. Timber floors are usually overboarded or replaced with a cementitious board before tiling.

Wet areas need tanking. Tiles and grout are not waterproof — the tanking membrane behind them is, and in a wet room it is the single component standing between the shower and the ceiling below.

Movement joints are required at defined intervals across large tiled areas and at every change of plane and abutment. Omitting them is the usual reason a large tiled floor eventually lifts or cracks along a line.

Setting out is decided before the first tile is fixed: from the eye line and the focal wall, so that cut tiles land where nobody looks and full tiles land where everybody does.

Those are the national rules. In Havering they are administered by London Borough of Havering, and they can be tightened locally by a conservation area or an Article 4 direction covering your street. We confirm the position for your address in writing before you commit to anything.

Working in Havering

We are based in Chadwell Heath, RM6. Havering is home ground — our teams are in the area most weeks, and we know the building stock, the loading restrictions and the council's building control team. Scaffolding licences, skip permits and highway licences are all applied for in our name as part of the contract, because they have to be — they are the contractor's responsibility, not yours.

Access shapes the programme in London more than anywhere else. Narrow streets, controlled parking and shared alleys all affect how materials get in and waste gets out, and we plan for it at survey stage rather than discovering it in week two. Where a job needs a wait-and-load skip or a grab lorry instead of a standing skip, we say so in the quote.

You get a named project manager for the duration — Jagpreet (Sandeep) or Simarjit (Sonu) depending on where the job sits — and you pay in arrears of work completed rather than handing over a deposit and hoping.

Our work

Tiling we have completed

Our own photographs, not stock images. Ask and we will send you jobs closest to your Havering postcode.

Rear extension and loft conversion in London stock brick with French doors, North Finchley
Extension + loft, North Finchley
Brick rear extension with French doors opening onto a landscaped garden
Brick extension and garden
Rear loft conversion with new windows and Juliet balcony on a brick terrace
Loft conversion, rear elevation
Rendered multi-storey rear elevation of a new build under construction
New build, rear elevation

Answers

Tiling in Havering — common questions

Do I need planning permission for tiling in Havering?

It depends on the property type and what is proposed. Many single-storey rear extensions and loft conversions fall under permitted development, but those rights do not apply to flats and are restricted in conservation areas or where an Article 4 direction applies. We check the planning position for your specific address before quoting, and tell you in writing which route applies.

How do you price the work?

From a site survey, written up as a fixed and itemised scope before any deposit is discussed. If something genuinely unforeseen appears once work is opened up, it is priced and agreed in writing before we continue — never added to the final invoice after the fact.

When do I pay?

In arrears of work completed. You pay for work that has been done and inspected, not for work that has been promised. This has been how the company operates since 2008.

Which postcodes in Havering do you cover?

We work across the whole borough, including RM1, RM2, RM3, RM4, RM5, RM6 and the surrounding districts.

Who is the planning authority for Havering?

London Borough of Havering is the local planning authority and also runs building control for the borough. Planning applications, prior approval submissions and building control applications for your property all go to them, and we handle those submissions as part of the contract.

Do you handle Party Wall notices?

Yes, where the work requires them. Under the Party Wall etc. Act 1996, notifiable work on a shared wall needs 2 months written notice to the adjoining owner, while excavation near a neighbouring structure and building at the line of junction need 1 month. We serve the notices and manage the award process as part of the job.

Will I get certificates at the end?

Yes. Electrical work is tested and certificated under Part P, and building control issues a completion certificate where an application was required. You receive the handover pack — it is what a buyer's solicitor will ask for when you eventually sell.

How long will it take?

It depends entirely on scope, and we give a programme with the written quote rather than a guess on the phone. What we will not do is start a job we cannot resource, which is the usual reason a build stalls halfway through.

Also in Havering

Our other services in Havering

More on tiling across London, or see everything we do in Havering.

Skip the forms

Get a price for tiling in Havering

A picture and a postcode tells us more than any enquiry form. You will get a straight answer about cost and whether it needs planning permission.

CallWhatsAppQuote
WhatsApp us