SS BuildersGroup07792 281 879

Newham · East London · E16

Refurbishments in Canning Town

The Smart Solution for Refurbishments. Family-run since 2008, working across Canning Town and all 32 London boroughs.

Extension + loft, North Finchley

Refurbishments for Canning Town homes

For total peace of mind, online project tracking and a complete one-stop-shop — from plastering and tiling to the installation of underfloor heating or spotlight fittings — look no further than S S Builders London. We refurbish period terraces, ex-local-authority flats and new-build apartments across all 32 London boroughs, and we take the whole job: no chasing six different trades, no gaps between them where the programme quietly slips.

Substantially rebuilt post-war housing with large-scale contemporary regeneration around the Royal Docks. A high proportion of flats, which have no permitted development rights and usually need freeholder consent as well as planning permission.

That housing mix matters more than it sounds. It determines whether your refurbishments is a straightforward job or a structural one — how the loads transfer, whether a Party Wall Award is likely, and what the council will accept on the elevation. We survey before we price, so the number you get reflects your actual house rather than an average one.

Included as standard

  • Full survey and fixed written scope before any work starts
  • Strip-out, waste removal and skip management
  • Plastering, tiling, carpentry and decorating by our own trades
  • Electrical first and second fix, certified on completion
  • Plumbing, heating and underfloor heating installation
  • Kitchen and bathroom supply and fit
  • Online project tracking with photo updates
  • Payment in arrears of work completed
Timescale
2–10 weeks depending on scope
Planning authority
London Borough of Newham
Postcodes
E16
Housing stock
Mainly flats

What Canning Town housing means for the structure

Refurbishing a flat is mostly a leasehold question rather than a planning one. Internal works rarely need planning permission, but the lease almost certainly requires the freeholder's written consent for structural alterations, moving bathrooms and kitchens, and sometimes for changing floor coverings. Part E sound insulation applies where works affect the separating floor, and that is the item most often overlooked.

What needs approval in a refurbishment

Internal refurbishment rarely needs planning permission, but plenty of it is notifiable under the Building Regulations. Electrical work in a dwelling falls under Part P; new or altered drainage, structural openings and replacement windows all require building control involvement.

Removing a wall is the usual trigger. If it is load-bearing — and in most London terraces the spine wall is — it needs a structural engineer's calculation, an adequately sized beam, correctly sized padstones, and a building control inspection before it is covered up.

Listed buildings are a separate regime entirely: listed building consent is required for internal alterations as well as external ones, and it applies to features people often assume are cosmetic, such as original panelling, staircases and fireplaces.

Where the property is a flat, the lease usually requires the freeholder's written consent for alterations, and often for changing floor coverings. That consent takes time to obtain and should be started before the programme is fixed.

Those are the national rules. In Canning Town they are administered by London Borough of Newham, and they can be tightened locally by a conservation area or an Article 4 direction covering your street. We confirm the position for your address in writing before you commit to anything.

Working in Canning Town

We are based in Chadwell Heath, RM6. Canning Town is home ground — our teams are in the area most weeks, and we know the building stock, the loading restrictions and the council's building control team. Scaffolding licences, skip permits and highway licences are all applied for in our name as part of the contract, because they have to be — they are the contractor's responsibility, not yours.

Access shapes the programme in London more than anywhere else. Narrow streets, controlled parking and shared alleys all affect how materials get in and waste gets out, and we plan for it at survey stage rather than discovering it in week two. Where a job needs a wait-and-load skip or a grab lorry instead of a standing skip, we say so in the quote.

You get a named project manager for the duration — Jagpreet (Sandeep) or Simarjit (Sonu) depending on where the job sits — and you pay in arrears of work completed rather than handing over a deposit and hoping.

Our work

Refurbishments we have completed

Our own photographs, not stock images. Ask and we will send you jobs closest to your Canning Town postcode.

Rear extension and loft conversion in London stock brick with French doors, North Finchley
Extension + loft, North Finchley
White rendered rear extension with French doors and paved terrace
Rear extension, rendered finish
Brick rear extension with French doors opening onto a landscaped garden
Brick extension and garden
Rear loft conversion with new windows and Juliet balcony on a brick terrace
Loft conversion, rear elevation

Answers

Refurbishments in Canning Town — common questions

Do I need planning permission for refurbishments in Canning Town?

It depends on the property type and what is proposed. Many single-storey rear extensions and loft conversions fall under permitted development, but those rights do not apply to flats and are restricted in conservation areas or where an Article 4 direction applies. We check the planning position for your specific address before quoting, and tell you in writing which route applies.

How do you price the work?

From a site survey, written up as a fixed and itemised scope before any deposit is discussed. If something genuinely unforeseen appears once work is opened up, it is priced and agreed in writing before we continue — never added to the final invoice after the fact.

When do I pay?

In arrears of work completed. You pay for work that has been done and inspected, not for work that has been promised. This has been how the company operates since 2008.

Which postcodes in Canning Town do you cover?

We work across the whole borough, including E16.

Who is the planning authority for Canning Town?

London Borough of Newham is the local planning authority and also runs building control for the borough. Planning applications, prior approval submissions and building control applications for your property all go to them, and we handle those submissions as part of the contract.

Do you handle Party Wall notices?

Yes, where the work requires them. Under the Party Wall etc. Act 1996, notifiable work on a shared wall needs 2 months written notice to the adjoining owner, while excavation near a neighbouring structure and building at the line of junction need 1 month. We serve the notices and manage the award process as part of the job.

Will I get certificates at the end?

Yes. Electrical work is tested and certificated under Part P, and building control issues a completion certificate where an application was required. You receive the handover pack — it is what a buyer's solicitor will ask for when you eventually sell.

How long will it take?

It depends entirely on scope, and we give a programme with the written quote rather than a guess on the phone. What we will not do is start a job we cannot resource, which is the usual reason a build stalls halfway through.

Also in Canning Town

Our other services in Canning Town

Nearby

Refurbishments in nearby areas

More on refurbishments across London, or see everything we do in Canning Town and Newham.

Skip the forms

Get a price for refurbishments in Canning Town

A picture and a postcode tells us more than any enquiry form. You will get a straight answer about cost and whether it needs planning permission.

CallWhatsAppQuote
WhatsApp us