SS BuildersGroup07792 281 879

Redbridge · East London · E11

Extensions in Wanstead

The Smart Solution for Extensions. Family-run since 2008, working across Wanstead and all 32 London boroughs.

Extension + loft, North Finchley

Extensions for Wanstead homes

From the installation of steel beams and waste pipes to double glazing, we build extensions that clear building control first time. Most London extensions live or die on two questions asked early: does it fall under permitted development or need a full application, and is a Party Wall Award required. We answer both before you commit, in writing.

Handsome Edwardian and Victorian housing with conservation area coverage around the village and Wanstead Park. Permitted development rights are restricted here, so most external work needs a planning application designed to respond to the conservation area appraisal.

That housing mix matters more than it sounds. It determines whether your extensions is a straightforward job or a structural one — how the loads transfer, whether a Party Wall Award is likely, and what the council will accept on the elevation. We survey before we price, so the number you get reflects your actual house rather than an average one.

Included as standard

  • Feasibility check: permitted development vs. full planning
  • Architectural drawings and planning submission
  • Structural engineer's calculations and building control
  • Party Wall Act notices, surveys and awards
  • Foundations, drainage diversion and groundworks
  • Brickwork matched to existing, steelwork and roofing
  • Double glazing, bi-folds and rooflights
  • Electrics, plumbing, heating and underfloor heating
  • Plastering, screeding, flooring and decoration
  • Building control sign-off and completion certificate
Timescale
8–16 weeks on site
Planning authority
London Borough of Redbridge
Postcodes
E11
Housing stock
Mainly semi-detached

What Wanstead housing means for the structure

On a semi-detached house you have one party wall and one free flank, which opens up options a terrace does not have: a side extension, or a wrap-around taking in both the side passage and the rear. The party wall side still needs notice under the 1996 Act, but the flank side is yours to build up to, subject to the boundary and to any restriction on extending beyond a side elevation fronting a highway.

Planning and building control for extensions

A single-storey rear extension can often be built under permitted development rather than a full planning application: up to 3m deep on a terraced or semi-detached house, or 4m on a detached one, with a maximum height of 4m. Where it sits within two metres of a boundary, the eaves cannot exceed 3m.

The Larger Home Extension scheme doubles those depths — to 6m and 8m — but it is not automatic. It requires a prior approval application, and the council notifies your adjoining neighbours; if one objects within the consultation period, the council decides on the impact to their amenity.

Permitted development rights do not apply to flats or maisonettes at all, and they are removed or restricted in conservation areas and wherever an Article 4 direction is in force. That is the first thing we check, because it changes both the programme and the cost.

Whichever route the permission takes, the build itself is governed by the Building Regulations — Part A for structure, Part L for insulation and airtightness, and Part K where stairs or level changes are involved. Building control inspects at set stages, including before foundations are covered.

Those are the national rules. In Wanstead they are administered by London Borough of Redbridge, and they can be tightened locally by a conservation area or an Article 4 direction covering your street. We confirm the position for your address in writing before you commit to anything.

Working in Wanstead

We are based in Chadwell Heath, RM6. Wanstead is home ground — our teams are in the area most weeks, and we know the building stock, the loading restrictions and the council's building control team. Scaffolding licences, skip permits and highway licences are all applied for in our name as part of the contract, because they have to be — they are the contractor's responsibility, not yours.

Access shapes the programme in London more than anywhere else. Narrow streets, controlled parking and shared alleys all affect how materials get in and waste gets out, and we plan for it at survey stage rather than discovering it in week two. Where a job needs a wait-and-load skip or a grab lorry instead of a standing skip, we say so in the quote.

You get a named project manager for the duration — Jagpreet (Sandeep) or Simarjit (Sonu) depending on where the job sits — and you pay in arrears of work completed rather than handing over a deposit and hoping.

Our work

Extensions we have completed

Our own photographs, not stock images. Ask and we will send you jobs closest to your Wanstead postcode.

Rear extension and loft conversion in London stock brick with French doors, North Finchley
Extension + loft, North Finchley
Rear loft conversion with new windows and Juliet balcony on a brick terrace
Loft conversion, rear elevation
Rendered multi-storey rear elevation of a new build under construction
New build, rear elevation
Decorative cornice and Corinthian column plasterwork with recessed lighting
Decorative plasterwork

Answers

Extensions in Wanstead — common questions

Do I need planning permission for extensions in Wanstead?

It depends on the property type and what is proposed. Many single-storey rear extensions and loft conversions fall under permitted development, but those rights do not apply to flats and are restricted in conservation areas or where an Article 4 direction applies. We check the planning position for your specific address before quoting, and tell you in writing which route applies.

How do you price the work?

From a site survey, written up as a fixed and itemised scope before any deposit is discussed. If something genuinely unforeseen appears once work is opened up, it is priced and agreed in writing before we continue — never added to the final invoice after the fact.

When do I pay?

In arrears of work completed. You pay for work that has been done and inspected, not for work that has been promised. This has been how the company operates since 2008.

Which postcodes in Wanstead do you cover?

We work across the whole borough, including E11.

Who is the planning authority for Wanstead?

London Borough of Redbridge is the local planning authority and also runs building control for the borough. Planning applications, prior approval submissions and building control applications for your property all go to them, and we handle those submissions as part of the contract.

Do you handle Party Wall notices?

Yes, where the work requires them. Under the Party Wall etc. Act 1996, notifiable work on a shared wall needs 2 months written notice to the adjoining owner, while excavation near a neighbouring structure and building at the line of junction need 1 month. We serve the notices and manage the award process as part of the job.

Will I get certificates at the end?

Yes. Electrical work is tested and certificated under Part P, and building control issues a completion certificate where an application was required. You receive the handover pack — it is what a buyer's solicitor will ask for when you eventually sell.

How long will it take?

It depends entirely on scope, and we give a programme with the written quote rather than a guess on the phone. What we will not do is start a job we cannot resource, which is the usual reason a build stalls halfway through.

Also in Wanstead

Our other services in Wanstead

Nearby

Extensions in nearby areas

More on extensions across London, or see everything we do in Wanstead and Redbridge.

Skip the forms

Get a price for extensions in Wanstead

A picture and a postcode tells us more than any enquiry form. You will get a straight answer about cost and whether it needs planning permission.

CallWhatsAppQuote
WhatsApp us